Fitout Construction

Fitout Construction

Tecon - Accept fully functional workplace, fully equipped with lighting systems, electricity, air conditioning, ventilation and full furniture.
LIÊN HỆ TƯ VẤN

Definition of Fit out

Fit out office is the process of converting an empty space into a functional office. It is a complete transformation from start to finish of an empty space ready to be the company's office, the workplace of the employees. This is considered a process of "renewing" space. From an empty area, it will be transformed into a fully functional workplace, fully equipped with lighting systems, electricity, air conditioning, ventilation and full furniture.

Fit Out 2
Renovate the space, from an empty space to a full office

What jobs does Fit out of the office include?

In Fit Out, there are many work items, depending on the current state of the rented premises, the items will also change. In general, indispensable items in the Fit out interior construction process include:

  • Complete construction items

Including finishing items: ceiling, floor, walls, doors,...

  • Complete the M&E system

This category will include: lighting system, electrical system, network, telephone, air conditioning,...

  • Complete fire protection system

According to the requirements and regulations of the Building to properly implement the Fire Prevention and Fighting plan, comply with the provisions of law.

  • Complete interior decoration items

Including tasks: painting walls, decorating walls, arranging layouts,...

Fit Out 4

How long does it take to complete an office fit out?

Depending on the area and complexity of the building (project), Fit Out completion time will be flexible from 1 - 8 weeks. For large projects requiring complex structures and lighting installations, the schedule will be longer.

Fit Out 1

Notes during the Fit out process

Following the rules set out during the Fit Out construction process will help the construction unit plan more appropriately and not worry about project delays. Here are some things to consider in Fit out interior construction:

  1. Building regulations
  2. Construction time according to regulations
  3. Complexity of design drawings
  4. Materials used
Idesko UK
Materials used affect progress

Fit out office interior design and construction process at Tecon

To get to the stage of constructing the Fit out item, the Investor and Ideko will go through the following steps:

  • Meet and discuss design requirements. Tecon's design team will survey the current situation and advise customers on appropriate options
  • Create a 2D interior layout plan
  • Conceptualize ideas, finalize plans and conduct 3D design
  • 3D fastening, drawing up detailed technical drawings for construction permit
  • Carry out construction of fit out items and subsequent work.
  • Chia sẻ qua viber bài: Fitout Construction
  • Chia sẻ qua reddit bài:Fitout Construction

dỊCH VỤ

Liên quan

Office Interior Construction

Tecon - Accept office interior design, construct office furniture, produce office furniture according to designs or upon request!

Store Interior

What makes a brand leave a special impression on customers? Besides product quality, Shop design is the first factor that reaches customers and brings the most intuitive feeling about the brand.
Unique store design will help customers easily remember and "name names" among thousands of other competitors. To better understand the importance of Shop design as well as the field of association, what is an eye-catching design, and to update outstanding Shop design trends.